| What changes | Doors, drawer fronts, hinges, hardware and the visible cabinet surfaces | Everything: layout, cabinetry, counters, lighting, finishes and often walls |
|---|
| Cabinet boxes | Kept and covered in matching veneer or laminate | Replaced with new custom or semi-custom cabinetry |
|---|
| Layout | Stays the same (small additions like a pantry cabinet are possible) | Fully redesigned: islands, moved appliances, opened walls |
|---|
| On-site time | Typically a few days once doors arrive | Typically several weeks, depending on scope |
|---|
| Living with it | Kitchen usually stays usable throughout | Kitchen out of service during construction |
|---|
| Demolition & mess | Minimal, with no tear-out | Full tear-out, contained and cleaned daily |
|---|
| Permits | Generally not needed for cosmetic work | Often required for plumbing, electrical or structural work (we handle it) |
|---|
| Budget | Typically a fraction of replacement cost | Larger investment with the greatest transformation |
|---|